Mercier Bridge: Summer Work
Written by Paul Graif on 9 July 2020
As first reported by K1037, The Ministère des Transports du Quebec will be performing maintenance work on the Honoré-Mercier Bridge with that work set to continue throughout the summer. The construction work will mainly consist of slab repairs that will require the partial closure of the bridge for the duration of the work. That means that one lane only will be available in either direction on the span from July 17 at 10 p.m. to August 17, 5 a.m.