Overnight road work on Mercier Bridge
Written by Paul Graif on 12 August 2021
There is overnight road work on the Mercier bridge Thursday night.
It gets underway at 8pm and wraps up at 5am Friday.
Partial lane closures are scheduled for the top of the 138 east up-ramp and along the right lane of the Montreal-bound bridge as well as the right lane of the Kahnawake bound span – from the Seaway section towards the 138 west down ramp.
The work is weather permitting.