Mercier Weekend Closure

Written by on 23 April 2021


The Mercier Bridge will be down to one lane in either direction all weekend.  The Southbound or Kahnàwake bound span will be shut down for work on the overhead steel structure, with the closure begins at 10 pm tonight and is expected to be back to 2 lanes in each direction on Monday morning at 5 am. The Airlie entrance to the span will also be closed from LaSalle to access the Kahnàwake bound bridge during the same time-frame.


K103.7 Radio

K103.7 Radio

Current track

Title

Artist